![]() The Engineering design contract was awarded to Bergmann Associates of Conshohocken, PA. An August 2016 inspection of the bridge resulted in an overall poor rating and the bridge was listed as structurally deficient and in need of replacement. Montgomery County Bridge #163, which carries Lutheran Road over the Minister Creek in New Hanover, was originally constructed in 1923 as a single lane, two-span, continuous concrete slab bridge spanning 38 feet. The project remains on track to be completed by January 2024. Each beam has a weight of 22 Ton and measures more than 55 Feet in length. Update: 7/25/23: The pre-stressed Bulb Tee Beams have been placed at the construction site of Sterigere Street Bridge in Norristown. Motorists will be directed to follow the posted detour route via Stanbridge Street, Marshall Street, Markley Street and Harding Boulevard.Ī temporary Pedestrian Bridge has been erected to help maintain the walkability of the area. Due to the nature of construction and closure of the bridge, a detour has been established. Please allow extra time when traveling through the area because backups and delays may occur. ![]() Motorists are advised of a road closure is scheduled on Sterigere Street between Stanbridge Street and Harding Boulevard for replacement of existing bridge through January 2024. This will eliminate the current weight posting of the bridge and improve safety along the corridor and waterway. Under this contract, Montgomery County’s construction contractor will remove and replace the entire existing bridge structure and approaches over Stony Creek to allow for corridor and waterway improvements. Mill Creek Bridge - Lower Merion TownshipĬonstruction is underway to replace County bridge 177 to improve mobility and safety on Sterigere Street between Stanbridge Street and Harding Boulevard in the Municipality of Norristown, Montgomery County.As always, please use caution, expect delays and obey flaggers when traveling through active work zones. Flaggers will be present where necessary. The scope of work at this location includes underpinning the far abutment and far left wing wall and constructing rock protection along the far abutment and far left wing wall.Īll roads will remain open during construction. 295 – North Dietz Mill Road over Ridge Valley Creek, Salford Township. The scope of work at this location includes constructing rock protection along the abutments and pier and underpinning the pier, repointing the deteriorated stone masonry, rebuilding the damaged portions of the near left wingwall barrier, removing the sediment deposits and debris beneath Span 1, along the near abutment, and beneath Span 2 along the pier, and backfilling the scour holes throughout the channel in Span 2. 118 – Keith Valley Road over Park Creek, Horsham Township. Update: I n stream work at Bridge 73 has been completed and masonry work will be performed after Bridge 118 work has finished. The scope of work at this location includes constructing rock protection along both abutments and pier, repointing the deteriorated stone masonry and rebuilding the damaged portions of the near left and far left wingwalls, and removing the sediment deposits along the near right bank. 73 – Swedesford Road over Wissahickon Creek, Upper Gwynedd Township and Lower Gwynedd Township. This project consists of the maintenance, repair and other associated work at three (3) County-maintained bridges:
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |